| Q200 - Q299 |
| Q201 |
04/19/01 |
Government Source Inspection Requirements
(NASA contracts - Station Program) |
| Q202 |
06/04/01 |
Government Source Inspection Contracts
(SSME Program) |
| Q203 |
10/28/05 |
Pratt & Whitney Rocketdyne Source Inspection |
| 01/24/03 |
Boeing Source Inspection |
| Q204 |
08/15/03 |
Tin Plating |
| Q205 |
04/27/01 |
Evidence of Inspections and Tests
Performed By Seller |
| Q206 |
09/19/01 |
Government Source Inspection |
| Q207 |
04/27/01 |
Physical and Chemical Test Reports
Identified to Specific Lots |
| Q208 |
04/27/01 |
Evidence of Compliance with Reliability
Verification Provisions |
| Q209 |
06/14/01 |
Material Safety Data Sheet |
Q210 |
12/09/02 |
Supplier Designed Drawing
Request (For Standard Catalog Hardware Only) |
| Q212 |
12/10/02 |
Commercial Material Certification
Identification |
| 04/27/01 |
Material Certification Identification
|
| Q213 |
10/28/05 |
Oxygen Compatibility Testing |
| 04/27/01 |
Oxygen Compatibility Testing |
| Q214 |
04/27/01 |
Change Control of Baseline Documents
Contract Grouping Specification SSME (RL00144) or (RL10101)
|
| Q215 |
08/06/01 |
Records (SSME Program - Purchased
Labor Use Only) |
| Q216 |
07/16/01 |
Weld Repairs of Castings |
| Q217 |
10/28/05 |
Hazardous Materials Requirements |
| 04/21/04 |
Hazardous Materials Requirements
- Canoga Park |
| Q218 |
10/28/05 |
Metallic - Materials Acceptance Testing - Canoga Park |
| 04/21/04 |
Metallic - Materials Acceptance Testing
- Canoga Park |
| Q219 |
10/28/05 |
Material Review Record Inspection Discrepancy and Correction Record (IDCR) |
| 04/27/01 |
Material Review Record Inspection
Discrepancy and Correction Record (IDCR) |
| Q220 |
04/19/02 |
Nondestructive Test Documentation
Requirements SSME Program |
| Q221 |
04/27/01 |
Special Procurement Quality Assurance
Requirements |
| Q222 |
06/14/01 |
Electrostatic Discharge Sensitive
Protection |
| Q223 |
10/28/05 |
QA- Nondestructive Test Source Inspection |
| 04/27/01 |
QA-NDT Source Inspection |
| Q224 |
11/27/01 |
Inspection Record Retention (Five Years) |
| Q226 |
07/16/01 |
Space Station Product Assurance Requirements
|
| Q227 |
08/01/01 |
Inspection Record Retention (Ten
years) |
| Q228 |
05/01/06 |
Inspection Requirements - SSME Program
Only |
| 11/22/02
|
| Q229 |
05/01/06 |
Inspection Record Retention (SSME
Program) |
| 08/27/01 |
| Q230 |
08/11/05 |
Government Source Inspection Requirements- Department of Energy (DOE) |
| Q232 |
09/20/01 |
Special Procurement Quality Assurance
Requirements For Non-SSME Program Hardware |
| Q233 |
10/16/01 |
Nondestructive Inspection for Space
Station Hardware |
| Q235 |
11/22/02 |
Characteristic Risk Analysis / Characteristic
Accountability Worksheet - SSME Program Only |
| Q236 |
04/30/01 |
Space Station EEE Hardware - Evidence
of Lot Date |
| Q237 |
06/14/01 |
Requirements for Printed Wiring Boards/Flex
Circuits (RS68 Program Only) |
| Q238 |
06/14/01 |
Requirements for Process Producibility
Analysis (PPA) Testing of Multilayers (RS68 Program Only) |
| Q239C |
10/28/05 |
Non-Metallic Materials Acceptance
Testing |
| 02/07/05 |
| 06/21/04 |
| Q243 |
10/28/05 |
Tool Accuracy Requirement |
| 08/21/01 |
Tool Accuracy Requirement |
| Q271 |
05/01/06 |
AS9102 Aerospace First Article Inspection Requirement with Buyer Source Inspection, ASQR-08.2 and Deliverable Report |
| 10/28/05 |
AS9102 Aerospace First Article Inspection Requirement Deliverable Report |
| 04/21/04 |
AS9102 Aerospace First Article Inspection
Requirement with Boeing First Article Inspection (BFAI) and
Deliverable Report |
| Top |